Monday, October 11, 2004

Moving Right Along

I actually got some work done on Ribby today. Are you amazed? I am! So far I have completed the back and the right front. All I have to do after that is the left side of the front and the seaming. I should have it done tomorrow. I'm going to be giving it to my mom next month, so I'll be able to post pictures of it then.

After Ribby I am going to finish that Fair Isle Bag. I can't believe how long it has taken me to finish these projects. Unfortunately, I don't get but about an hour or so a day to knit because of all the other stuff I have going on in my life. Some days I'm lucky to get in an hour. Today I was off, and I didn't clean my house so that I could get some knitting done. I can actually be productive when I put my mind to it. On top of all the work I did on Ribby, I made two swatches for future projects.

Something seems to be wrong with the links to Groovy Crochet. As some of you may know, the pages are accessed through an internet archive site. The actual Groovy Crochet site has been closed down for quite some time. Maybe there is something going on with this archive site. I have no clue. I'm going to leave the links up anyway, because it may be right back to normal soon.